Skip to Content Skip to Recite Me Skip to Footer
departures
arrivals
A man puttting a suitcase on a train

Daily performance report

Want to see how our trains are running? Read our on-time report for yesterday’s service or download a report on our four-week performance

On time punctuality 

From April 2019, we are publishing a new measure of train punctuality as part of national plans to improve train service performance, reduce delays and increase transparency with ‘to the minute’ punctuality data. It is known as 'On time' and records punctuality at each station along a journey.

The current data known as the public performance measure (PPM) considers a train to be on time if it arrives within 5 minutes of its scheduled arrival time (or 10 minutes for long distance operators).

The daily report

Every day we publish our performance statistics for the previous day. We report two figures: 

  • PPM – the percentage of trains arriving at their destination within 5 minutes of schedule
  • On time – the percentage of trains arriving at the scheduled time at each station stop on a journey 

Wednesday 28th February 2024

Route PPM On Time
Thameslink 78.6% 57.9%
Southern Mainline 74.9% 55.5%
Southern Coastway 85.4% 64.6%
Southern Metro 87.2% 75.2%
Gatwick Express 55.6% 43.0%
Great Northern 67.6% 48.5%
Total 78.7% 60.1%