Skip to Buy Tickets Skip to Content Skip to Footer
A man puttting a suitcase on a train

Daily performance report

Want to see how our trains are running? Read our on-time report for yesterday’s service or download a report on our four-week performance

On time punctuality 

We publish a measure of train punctuality as part of national plans to improve train service performance, reduce delays and increase transparency with ‘to the minute’ punctuality data. It is known as 'On time' and records punctuality at each station along a journey. We have been reporting data in this format since April 2019.

The current data known as the public performance measure (PPM) considers a train to be on time if it arrives within 5 minutes of its scheduled arrival time (or 10 minutes for long distance operators).

The daily report

Every day we publish our performance statistics for the previous day. We report two figures: 

  • PPM – the percentage of trains arriving at their destination within 5 minutes of schedule
  • On time – the percentage of trains arriving at the scheduled time at each station stop on a journey 

Thursday 26th February 2026

Route PPM On Time
Thameslink 86.6% 66.1%
Southern Mainline 78.2% 60.2%
Southern Coastway 90.7% 71.5%
Southern Metro 87.1% 71.5%
Gatwick Express 63.9% 58.3%
Great Northern 89.1% 68.8%
Total 85.5% 67.0%

Station by station performance

You can now view periodic (4-weekly) performance data for punctuality and reliability of train services at individual stations. This data includes the percentage of trains arriving at the station within three minutes of their scheduled arrival and the percentage of trains that were scheduled, but did not call at the station.

Select a station and view performance data